Customization: | Available |
---|---|
After-sales Service: | Engineers Guide Installation and Commissioning on |
Power Source: | Hydraulic |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. The motor is directly connected to the rotor, the speed can reach 3000r/min, the failure rate is low, and the efficiency is high. Safe operation, low noise, stable work
2. The body adopts a unique structural design, and the discharge is smooth and seamless.
3. The particle size of the screen is adjustable, which can process raw materials of different sizes into uniform wood particle size to ensure the finished product requirements.
4.Used together with cyclone dust collector and bag filter, the dust removal efficiency is higher and the pollution rate is low.
Model
|
Power
|
Capacity
|
SHD65-75
|
55KW
|
1-1.5T/H
|
SHD100-80
|
90KW
|
3-4T/H
|
SHD130-80
|
110KW
|
4-6T/H
|
SHD160-100
|
160KW
|
6-8T/H
|
SHD140-A
|
220KW
|
8-10T/H
|
SHD160-150
|
250KW
|
10-12T/H
|
We are Shanghangda Machinery Manufacturing Co., Ltd, the manufacturer was established in 1999, one of the first Chinese companies to initiate its own research capabilities in wood chipper and biomass pellet technology.Shanghangda Products are specialists in the design and manufacture of high quality chip and wood pellet equipment ,has been the leading manufacturer of the highest quality wood chipper and wood pellet machine available on the market today, products are exported to Europe, America,
Africa,Southeast Asia and other countries around the world We got creditable good praise from our customers in many years.
1. Are you factory?
Yes, We are. As a professional manufacturer, we have more than 10 years factory experience
2.How shall I pay you?
After signing the sales contract, 40%T/T of the sum shall be paid as deposit, and the remaining 60%T/T shall be paid off before the goods leave the factory. We can negotiate specific payment terms with the customer.
3. How long is the delivery time?
For standard machines, it will be 10-15 working days
4. Q: Will you send engineers to install the plant?
A: yes, but at an extra cost payable by the customer. Or you can get local contractors to do the commissioning and we send one supervising engineer.